INSTALLATION STEPS

Preliminary Actions
Establish the low water point and high water point on your piling or seawall. Mark the half way mark between high and low tide. The lower attachment bracket of the slide assembly will be placed just above that mark. The slide assembly installation should be done as close to low tide as possible.

Slide Assembly Placement Diagram
Slide Assembly Placement Diagram

Piling/Seawall Side Pipe Length:60″

Float Side Tube Length:48″