ACCUDOCK HEAVY DUTY ALUMINUM RAILINGS

We use 1-1/4″ schedule 40 aluminum pipe to fabricate railings to your specifications.Whether it is a single, double, or a triple rail system, our team takes into mind the configuration layout of your dock, and builds safety railings that are easy to install. We use 1-1/4″ schedule 40 aluminum pipe to fabricate railings to your specifications. As with all other custom fabrication, we pre-assemble and number each piece for ease of field installations. Railing foot pads bolt into the aluminum frame surrounding each float section with 3/8″ SS hardware. Railings foot pads can be adapted to be removable.

Yacht Cleaning Dock

Single Railing

Yacht Cleaning Dock

Double Railing

Yacht Repair Dock

Triple Railing

Yacht Repair Dock

Railing Connection for added strength

Yacht Cleaning Dock

Full Frame

Contact Us with the specifications and requirements necessary, and we will provide a floating platform with railings for your site.